Job description:

 

Redesign and construct the existing drop off point and school access , together with major works to the school playing fields.

Site set-up Welfare and Security; site separation; site strip; site levelling; asbestos management; demolition; road access alteration; barrier works; road surfacing; signage.

 

Formation of new hockey pitch with artificial turf and netball courts with porous tarmac surface. The works also include associated drainage, fencing, gabion retaining walling and lighting as well as external repairs to the swimming poll plant room.